Call: +44(0)1234 841221 E-mail: [email protected] Case Study of Mitsubishi Air conditioning Heat-pump installation at GRT Builders & Scaffolding Head Office, Bedfordshire, UK (12/06/19) Installation of office air conditioning heat-pump systems:
Orion air conditioning and refrigeration ltd complete the installation of a Mitsubishi Heavy Industries air conditioning heat-pump heating system for the new head office building of GRT Limited, Bedfordshire. The office building is spread over 2 stories and the client required heating and cooling. In the summer the building would get extremely hot due to the sun shining through the skylight windows and in winter the large open area had the potential to get cold.
Project Pictures:
What air conditioning heat-pumps were installed in the offices and server room: Main Office: 3 x Mitsubishi
Heavy Industries Air Conditioning FDTC50VH Compact Cassette 5Kw/17000Btu
R32 240V~50Hz
6 of Mitsubishi
Heavy Industries Air Conditioning SRK25ZSP-W Wall Heat pump
2.5Kw/9000Btu A R32 240V~50Hz
Office air conditioning and Heat-pump efficiency and CO2 emissions: This office air conditioning heat-pump system took around half an hour to heat fully but once warm the outdoor heat-pump ramped down because the temperature had been reached therefore just pumping small amounts of heat in to maintain heat.
Contact Us:Sales Installation and Service
UK: +44 (0)1234 841221
|
home | sitemap | JetHeat Heaters | JetFlow Portable Fans And Extractors | Space Heaters | Privacy |
Orion Air conditioning and refrigeration ltd. All rights reserved Created@2005 Last updated - 09/01/2020 |